LASCO HOU 500 Forging Hammer Line
Automated Forging Hammer Line for High-Throughput Metal Forming

Description
The forging hammer line starts from the blank section, then the metal bar is supplied to 625 kW preheating Elotherm machine and cutting into blanks with scissors. Next, the workpiece is transported to an induction furnace for subsequent pre-forming on Eumuco ARWS1a forging roll. After that, the workpiece enters the Lasco HOU 500 upper pressure hammer. After deburring, the workpiece feeds onto a controlled cooling conveyor of 12 meters length.
Project Value
End-to-end project management covering acquisition, disassembly, logistics, and compliance — executed with precision and global fluency.

Machines Included in This Product Line
Explore individual units from this integrated automotive paint line—each engineered for speed, precision, and compatibility within high-volume production environments.
Product Lines from The Same Factory
These additional lines were operated within the same factory as the automotive paint system—available for purchase individually or as part of a larger site transition.
Your Contacts for This Project
Have questions about the machine, logistics, or technical details? Reach out directly to our specialists—they’ll guide you through every step with clarity and care.














